Standard Automata SA · 2

Compliance Retainer

Continuous compliance control plane.

A retainer that keeps the baseline green — not a bucket of hours


1

Who it’s for

Teams with an enterprise deal hinging on SOC 2, or an authorisation boundary they have to keep defensible. Teams with one or two developers who can merge PRs.

It works for commercial SOC 2 and for IL2–IL5 or air-gapped environments, because it is the same control plane either way. The framework changes; the mechanism does not.

We don’t touch business logic. We make platform and compliance boringly predictable.


Standard

Baseline, plus an audit you are actively walking into

Everything in Baseline, plus

  • Active audit preparation
  • SOC 2 evidence pack
  • Control mapping
  • System security plan (SSP) support

Who moves up to this

  • An audit window with a date on it
  • An assessor already asking for the evidence pack

$7,500 /mo

Talk through the fit

2

Add-on — Compliant RAG

Don’t buy a chatbot — buy a corpus boundary an assessor will believe. Identity-scoped retrieval, separating corpora by construction, inside the impact-level boundary you already have. A retrieval boundary you cannot attest is not a boundary.

as a project$12,000 – $25,000
as a retainer add-on$3,000 /mo
requiresCI/CD Foundation

It requires Foundation because a retrieval boundary you cannot attest is not a boundary — and attestation is what Foundation builds.

3

The boundary

Anything outside the scope above is quoted separately at $250/hr, four-hour minimum.

That rate exists to be avoided. It is deliberately not a discount on scope creep — if work keeps landing outside the boundary, the honest answer is a project, not an invoice.

4

What you are actually buying

NIST 800-53 and 800-171 CUI controls codified as infrastructure, not described in a document that drifts from it.

Least privilege as architecture rather than as a memo. Logs, metrics and traces in one queryable store, with evidence export as a first-class output.

5

How we start

1$1,500 fixed-fee infra review. One week. You keep the findings either way
2The review says whether you need Foundation, the retainer, or neither
3Retainer begins. Thirty days’ notice, both directions

Book the review